2004 08 30 Tropical Storm Gaston Day 1 - Our Sandbox Toys are Bigger than Yours 2004 12 30 Second Cut, Headwall Starts 2005 01 17 Pipe Install, Last Sections 2005 01 18 Riprap In, Old Pipe Out 2005 01 19 Riprap In, Headwall Dig, Snow 2005 01 21 Headwall Pour Starts 2005 01 24 Headwall Forms Work 2005 01 25 Headwall Forms Work 2005 01 26 Headwall Forms Work, Headwall Poured 2005 01 27, Riprap, Drive Repaired 2005 04 15, Last Riprap, Grading |
|
Day 1 - Our Sandbox Toys are Bigger than YoursWell, the fun begins. We had about 1/3 of the pipe delivered today, and some exploratory digging for water lines and such. At the end of the day we have two of these tracked excavators in the yard and one large front loader. What have you got in your yard? Each of these sections weighs about 6 tons. There will be about 50 of them. Made in Roanoke VA and trucked here. Sharon can almost stand up in these. I will take a snap of her in one tomorrow. I took this next one before all of the first 1/3 of the pipe had turned up. Tomorrow they start ripping things up. |
||||